Meaning
Control parameters in injection moulding define the exact screw position or cavity pressure at which the moulding machine transitions from velocity-controlled filling to pressure-controlled packing. Configuring the transfer point setting ensures that the cavity fills almost completely under controlled speed before pack pressure density control engages. Correct switchover execution prevents component flash, sink marks, weight variation, and internal stress concentrations.
Switchover Control
Screw position transducers trigger switchover when the injection screw reaches a specified stroke location. Position-based switchover provides reliable control when resin melt viscosity remains consistent across production lots. Modern moulding machines evaluate hydraulic pressure or cavity pressure signals to refine the transfer point setting dynamically during the filling phase.
Early switchover causes slow cavity filling, leading to flow lines and short shots, whereas late switchover causes pressure spikes that overpack the gate area and flash the parting line.
Quality Defect
Premature packing causes hesitation marks and incomplete part fill as molten polymer cools before reaching cavity extremities. Conversely, late transfer forces excessive melt volume into a filled cavity, generating high residual stress and part deformation upon ejection.
Viscosity Sensitivity
Regrind addition and melt temperature variations alter polymer viscosity, shifting the cavity pressure profile. Position-based transfer without pressure compensation leads to shot weight fluctuations during extended runs.