Meaning
Formal validation procedures establish that manufacturing equipment is delivered, set up, and configured according to the manufacturer specifications and engineering designs. Performing an installation qualification represents the initial stage of the equipment validation process for a new injection moulding press or extruder. This phase focuses entirely on the physical and environmental setup of the machine.
It does not involve running actual production resin.
Equipment Verification
Field engineers systematically check the identity, model number, and physical condition of the newly received machine against the purchase order. They document the serial numbers of the main unit and auxiliary equipment like chillers and dryers. Every sensor and safety gate must be tested to ensure correct installation.
This step prevents the activation of a machine that is structurally unsound or incorrectly wired. The documentation generated during this phase becomes a permanent part of the equipment history file. It provides the foundation for subsequent process testing.
Technical staff must also verify that the machine is perfectly level on the factory floor. This level position prevents uneven wear on the tie bars during high-pressure clamping cycles.
Utility Check
Confirming the supply of electric power and compressed air is the next task in the protocol. If the cooling water flow rate or temperature fluctuates, the injection mould will not maintain a stable temperature. Electrical supply must match the voltage and phase requirements of the hydraulic pumps and heater bands.
Verifying these connections ensures the machine runs under stable conditions.
Process Boundary
Establishing the boundaries of the physical setup prevents future operational errors that can damage tooling or injure workers. Only after the completion of this phase can the machine proceed to operational testing. It is the gateway to the next validation stage.
This protocol is completed before any plastic resin is heated in the barrel.