Meaning
Injection control boundary defines the specific screw position or hydraulic pressure where the molding machine switches from velocity control to pressure control. Establishing the transfer point prevents the mold from being overfilled under high velocity. This switch occurs before the mold cavity is completely full.
Phase Transition
Screw velocity is maintained at a set rate during the filling phase to ensure a uniform flow front. As the screw reaches the transfer point, the machine switches to the pack and hold phase. This transition is necessary to prevent flashing while ensuring that the part is fully packed to avoid shrink defects.
Pressure Peak
Cavity pressure rises rapidly when the melt front reaches the end of the flow path. If the transfer point is set too late, the pressure spike can damage the mold or cause flash. Selecting the correct position ensures that the transition occurs smoothly without generating excessive pressure spikes in the hydraulic system.
Quality Control
Inconsistencies in the switchover position will lead to variations in part weight and dimensions. When the transfer point is inconsistent, the parts will alternate between being short and being flashed. Monitoring the screw position at switchover ensures that each cycle produces a dimensionally stable molded part.