Meaning
Quality assurance procedures that evaluate the very first physical parts produced from a newly manufactured injection mould verify that the tool geometry and dimensions match the original engineering designs. Conducting a t1 sample verification allows the moulding team to identify dimensional discrepancies and warpage issues before the mould is approved for high-volume runs. It represents the transition from the tooling phase to process optimization and validation.
Metrological Inspection
The initial test run of a new mould utilizes the intended production resin to ensure that the material shrinkage behaves as expected. During t1 sample verification, inspectors perform detailed metrological scans to measure critical dimensions, wall thicknesses, and hole alignments against the 3D computer-aided design model. They also examine the parts for common injection defects, including sink marks, flash, weld lines, and short shots.
This testing helps isolate tool errors from process variations, ensuring that any adjustments are made to the steel of the mould rather than through artificial adjustments of the process window. The resulting reports guide the tooling workshop in performing the necessary steel-safe modifications before the next trial run.
Process Optimization
The evaluation also establishes the baseline moulding conditions for future production runs. By documenting the melt temperature, injection speed, and hold pressure during this initial trial, the processor can define a stable process window that delivers consistent parts.
Approval
Approval at this stage is the gatekeeper for subsequent tool tuning and final production approval. It ensures that the steel geometry is fundamentally sound before texture or polish is applied.