Meaning
Machine screw position marking the changeover from velocity-controlled filling to pressure-controlled packing governs the transition between injection phases. Setting the volumetric transfer point accurately prevents cavity over-pressurization while ensuring ninety-five percent cavity fill before hold pressure engages. Early transfer results in slow filling, weld line defects and premature gate freezing.
Late transfer causes pressure spikes, tool parting and flash formation. Datasheet recommendations guide initial settings, but precise transfer positioning relies on stroke length calculations and cavity volume verification.
Cavity Filling
Dynamic velocity control drives polymer melt rapidly into the mould until the screw reaches the designated position. Reaching the volumetric transfer point signals the machine hydraulic system to shift from speed control to holding pressure control. Smooth velocity decay during transition prevents momentum-driven pressure surges.
Proper position calibration maintains flow front velocity without shocking cavity walls.
Viscosity Variation
Batch-to-batch changes in resin melt flow rate affect how much material enters the cavity before transfer occurs. Fixed-position volumetric transfer point settings produce variable cavity fill levels when melt viscosity fluctuates. Using cavity pressure sensors to trigger transfer compensates for resin viscosity shifts automatically.
Process validation studies compare position-based transfer against pressure-based transfer to optimize cycle repeatability.
Part Integrity
Precise timing of the control transition shapes part density, cosmetic appearance and dimensional stability. Improper volumetric transfer point selection leads to sink marks if packing begins too early, or flash if filling continues too long. Adjusting transfer position in small increments optimizes part weight consistency across extended production runs.
Stable machine hydraulic response ensures reliable transfer timing throughout multi-shift operations.