Meaning
Financial expenditure required to alter or repair an injection mold after it has been built. When a plastic part fails to meet dimensional tolerances during trial runs, tool modification cost accumulates through the physical machining of the steel cavity to adjust wall thicknesses or move gate locations. This expense is a critical variable in product development budgets and can escalate quickly if multiple iterations are needed, which is why pre production simulation is heavily utilized.
Economic Driver
Machining steel cavities is a skilled process that requires specialized electrical discharge machining or CNC milling. The labor hours and machine time needed to change the mold geometry represent the main component of these expenditures. Material waste and tool downtime also add to the total expense during this adjustment phase.
Process Consequence
Production delays happen when the tool is removed from the molding press for modification. These delays can postpone product launches and lead to contract penalties if delivery schedules are missed. For high volume projects, every day of tool downtime represents lost revenue.
Prevention Measure
Using simulation software to optimize mold design before cutting steel is the most effective way to minimize these expenses. Predicting flow behavior and shrinkage helps designers make correct design decisions before physical manufacturing begins. This step avoids the need for corrective steel work.