Meaning
The removal of heavy injection moulds or extrusion dies from their production presses requires specialized mechanical lifting and transport techniques. Executing a rigging extraction involves disconnecting all cooling, heating, and hydraulic lines before lifting the tool out of the machine platens. This operation is performed during tool changes or when a mould must be relocated for major maintenance.
Operational Risk
Handling heavy steel tools weighing several tons presents severe hazards to both personnel and the injection press itself. An incorrect lift can damage the tie bars, platens, or the press enclosure. To minimize these hazards, the rigging plan must account for the centre of gravity of the tool to prevent it from swinging when lifted.
Equipment Setup
Technicians must use rated overhead cranes, hoist rings, and slings that exceed the total weight of the tool. Heavy-duty lifting eyes are threaded directly into the mould plate, ensuring the threads are fully engaged to prevent stripping. The crane must be positioned directly above the center of the tool to ensure a vertical, controlled lift.
This alignment prevents lateral forces from damaging the machine guides as the tool moves upward. It also ensures the mould does not scrape against the press tie bars.
Demobilization Step
After the tool has been lifted clear of the machine, it is secured onto a heavy-duty transport cart or pallet. Technicians then apply a protective rust inhibitor to the open mold faces to prevent oxidation during storage or transport. The crane is then disconnected, and the tool is moved to the maintenance bay or storage racks.